CopperCo - Lady Annie Mine Heap Leach Pad Cell 1 and Process and Stormwater Ponds

Projects ~ Liners

Principal: CopperCo
Head Contractor: CDEC
Location: QLD
Date:

Project Scope:

Fabtech Australia was engaged by CDEC to supply and install a geomembrane system to Lady Annie Mine’s Heap Leach Pad Cell 1 which was 250,000m2  including drains, process ponds and stormwater ponds.

Additional Information:

Additionally Fabtech designed and constructed a floating geomembrane cover to their 200ML water storage asset. The heap leach pad design was conventional being 140m long and comprised a single layer of 1.5mm HDPE geomembrane. Night works were undertaken to overcome extreme daytime temperatures.  