Fabtech Australia was engaged by CDEC to supply and
install a geomembrane system to Lady Annie Mine’s
Heap Leach Pad Cell 1 which was
250,000m2 including drains, process ponds and
stormwater ponds.
[ + read more ]
Fabtech was engaged by Daracon to undertake the supply
and installation of geomembrane lining systems to four
of Santos’ waste water treatment ponds.
[ + read more ]
Fabtech was engaged by RTL to design, supply, and
install a complex multi-layer geomembrane lining system
to the Yallourn Power Station’s channel diversion
in Morwell, VIC requiring 570,000m2 of materials and
30kms of welding with QA approval.
[ + read more ]
Design, supply, and installation of replacement liner and floating cover to SA Water’s Happy Valley Potable Water Storage, including removal and disposal of the existing liner and cover.
Supply and installation of HDPE geomembrane to Santos
Mt. Kingsley Dam, including electrical leak detection
and commissioning.
[ + read more ]
Supply and installation of triple layer lining system,
permanent ballasting of the floor, animal egress and
water level indicators to the following associate
ponds:
[ + read more ]
Supply and installation of HDPE liner for the dam reservoir in order to accommodate storage of the PFW. Supply and installation of artificial grass based animal egress pannels in four locations of the water storage dam at Santos Fairview operations.
Supply and installation of 1.5mm geomembrane liner and
animal egress matting, and installation of water level
indicators in Santos Ben Bow Pond.
[ + read more ]
Supply and installation of HDPE geomembrane liner
inclusive of artificial animal egress matting and
water level indicators at Santos Washpool Creek
operation.
[ + read more ]
Supply and installation of geomembrane liner,
cuspated 3m drains, biaxial 1m drains, fabricate and
place ballast bags, and drainage sumps.
The Golders design incorporated a drainage system with
five cuspated drain arterial channels wrapped in filter
[ + read more ]
Supply and installation of 1.5mm geomembrane liner and
animal egress matting.
[ + read more ]
Supply and installation of geotextile liner underlay,
2mm HDPE smooth geomembrane liner, water depth
indicators and permanent ballast in toe. Commissioning
included electronic leak detection assessment.
[ + read more ]
In addition to a leachate collection storage the
landfill cell comprised a multiple layer system required
the supply and installation of 24,500m22.00mm DST HDPE
liner over a 3.00mm CCL at the SRWRA Landfill Cell 4.
The liner was protected by a geotextile cushion
installed over the liner.
[ + read more ]
Supply and install of 2.0mm single sided textured HDPE
geomembrane for the north bund wall and the south side
wall. Supply and install 2.0mm smooth HDPE
geomembrane for the basal liner including sumps and
under the eastern temporary bund wall. Supply and
install cushion geotextile to cover all exposed
[ + read more ]
Supply and installation of 1.5mm thick, smooth HDPE
liner to the base area and 2.0mm thick, single sided,
textured HDPE liner to the sides of the cell as
specified by the client. Supply and installation of
a temporary liner 'flap' over
a temporary bund (single-side textured 2.0 mm HDPE
[ + read more ]
Design, supply and installation of floating covers.
Design, supply and installation of floating covers.
Design, supply and installation of floating covers.
Design, supply and installation of floating covers.
Design, supply and installation of floating covers in Victoria.
Design, supply and installation of 350,000m2 evaporation cover.
Design, supply, and installation of a floating cover
system, including removal and disposal of the
existing cover. Supply and installation of cover
ancillaries including: float system, sand filled ballast
system, two off aluminium personnel hatches and
platforms, two off walkways to hatches and provision of
[ + read more ]
Project manage, design and construction of geomembrane
liner and floating cover systems, remediation of basin,
construction of concrete structures, earthworks,
perimeter anchor beam and pavement, pipe work, valving
installation and security.
[ + read more ]
Detailed design, supply and construction of potable
water storage lining and cover systems for the new
storage basin at Mt Pleasant Water Treatment Pant.
[ + read more ]
Construction of a 200ML associate water storage pond
including: clearing and grubbing of site, set-out,
preparation of laydown areas and temporary storages,
site amenities and facilities. Cut and fill pond
including conforming secondary clay liner, leak
detection system, sumps, spillways, installation of
[ + read more ]
Design, supply and construction of a 180ML potable
water storage facility including civil works, lining and
cover systems, pipe systems and security.
[ + read more ]
Design, supply and construction of a 50ML potable
water storage facility including civil works, lining
system, cover system, pipe systems and security.
[ + read more ]
Supply and construction of liner and floating cover
systems inclusive of associated civil works for the
storages being part of the State Government Water
Eefficiency Improvement Programme. The new waste
water treatment plant was constructed requiring a lined
and covered effluent feed pond and two lined and covered
[ + read more ]
Design, supply and construct the 60ML potable water
storage lining and cover systems to replace the failed
liner and cover.
[ + read more ]
Design, supply and installation of Cover Anaerobic
Lagoon to abattoir waste water treatment ponds;
including supply and installation of HDPE liner systems
in order to implement improvements to the waste water
treatment facility.
[ + read more ]
Design, supply, and construction of a floating
cover on Horsham Low Level Potable Water Storage
to eliminate evaporation, air and animal-born
contamination of the potable water and accommodate an
existing jetty structure in the lagoon.
[ + read more ]
Fabtech Australia’s successful completion of the
27,000m² Wattle Park Reservoir Liner and Cover
Replacement was integral to Adelaide
metropolitan’s water supply and the broader
success of the North South Interconnection System
Project. As the head contractor, Fabtech supplied,
[ + read more ]
Supply and installation of a 1.0mm Smooth HDPE Geomembrane, totalling 4,025m2.
Supply and installation of a 1.5mm thick HDPE geomembrane liner, including drainage flow-net leakage detection for the water storage dams.
Lining of a 16,600sqm wet weather pond and catchment pond with 2mm HDPE.
Supply and installation of HDPE liner for effluent containment.
Supply and installation of PVC liners to holding lagoons.
Supply and installation of a polypropylene liner to effluent system.
Supply and installation of 1.0mm HDPE liners for bio-remediation pads.
Design, supply and installation polypropylene effluent curtain.
Supply and installation of HDPE liners for Reed Bed Effluent Treatment.
Supply and installation of polypropylene baffle curtains to wastewater lagoons.
Supply and installation of polypropylene baffle curtain for STEDS Scheme.
Supply and install HDPE methane gas prevention liners
Supply and install PVC liner for effluent containment
Supply and install geotextile and 1.5mm HDPE liner for solid containment
Supply and installation of HDPE liner for CCA treatment sump area.
Supply and install wastewater/effluent tank liners to treatment plant
Supply and install wastewater/effluent tank liners to treatment plant
Supply and installation of 2.0mm, HDPE liner for Bolivar treatment Plant for effluent containment.
Supply and installation of 1.5mm, HDPE liner to two dams for Jilkminggan Sewerage upgrade.
Supply and installtion of 1.0mm, HDPE liner to dam at Santa Teresa Sewerage upgrade.
Design, supply and installation of liner and floating cover and bio gas collection system for effluent anaerobic lagoon.
Design, supply and installation of 1.5mm, HDPE liners for effluent lagoons for processing plant.
Design, supply and installation of liners and floating covers for effluent anaerobic lagoons (5) for winery applications.
Design, supply and installation of liners and floating covers for Effluent Anaerobic Lagoons.
Design, supply and installation of two reinforced polypropylene baffle curtains
Reinforced polypropylene baffle curtain to waste water treatment plant.
Supply and installation of 7,200m2, 1.5mm HDPE liner to STEDS scheme.
Supply and installation of 1.5mm HDPE liners and 1mm EL6000 gas collection cover.
Supply and installation of 50,000m2 of 1.5mm HDPE, GCL and two grades of geotextile for leachate collection at Wyong Shire Landfill.
Construction, lining and covering of a 6.5ML potable water storage dam with 8,000m2 of reinforced polypropylene.
Supply and installation of 1.5mm HDPE, GCL and geotextile to landfill.
Supply and installation of an effluent gas cover, incorporating a 2mm HDPE cover installed over an effluent lagoon and a bio-gas flare. A co-generation system was incorporated to allow use of gas produced.
Supply and installation of geotextile and GCL to landfill.
60,000m2 of 1.5mm HDPE for reclaimed water storage lagoon.
50,000m2 design, supply and installation of a polypropylene liner and reinforced polypropylene cover for potable water supply for East Gippsland Water, including associated concrete structures.
Design, supply and snstallation of a liner and anaerobic floating cover for Ingham’s Murarrie treatment plant.
Design, supply and snstallation of biogas collection cover for Goulburn Valley Water’s Shepparton High Rate Anaerobic Lagoon. The biogas collection is at present to be flared off with capacity for power generation at a later date. The total area covered was 54,000m2.
Design, supply and installation of a biogas
collection cover for the Werribee Farm Treatment Works.
[ + read more ]
Design and Construction of HDPE liner and RPP gas extraction cover for a 4ML effluent storage basin and HDPE liner and RPP gas cover and pipework systems for two 21ML anaerobic reactors.
Supply and installation of a 1.5mm HDPE geomembrane totalling 22,000m2.
Latrobe City Hyland Highway Landfill for the supply and
installation of HDPE geomembrane including gusset to
leachate pipe.
[ + read more ]
8,100m2 of 1.5mm HDPE.
Supply and installation of a 1.5mm thick, HDPE geomembrane liner totalling 11,000m2.
Supply and installation of 1.5mm smooth, HDPE for waste water storage dams totalling 20,000m2.
Water storage Lagoons approximately 60,000m2 of HDPE supplied and installed.
Supply and installation of 45,498m2 of 1.5mm thick, HDPE geomembrane liner in the storages included in the Wimmera Mallee Pipeline Project.
Design and construct project for removal of existing PP
cover, design of new HDPE cover, gas collection and rain
water disposal system for a HRAL. Installation was
performed over the full but decommissioned lagoon.
[ + read more ]
Supply and installation of HDPE geomembrane lining systems for a waste water storage lagoon. Approximately 21,000m2.
Supply and installation of HDPE liners to four waste water storage lagoons. The project included multipule concrete structures and penetrations requiring complex sealing systems. Approximately 23,000m2.
Design, supply, installation and testing of two 4ML
and two 7ML geomembrane lined and covered earthen water
storages including leak detection systems processing
waste water. The liner systems were constructed in
polypropylene and the pre-fabricated covers in
reinforced polypropylene.
[ + read more ]
Supply and installation of 1.5mm HDPE geomembrane liner for a waste water dam located at Lyndoch, approximately 12,000m2.
Supply and installation of geomembrane liners
in three ponds for Como Glasshouse Stage 2 Project.
[ + read more ]
Supply and installation of 1.5mm thick HDPE Geomembrane Liner approximately 24,000m2 for a Stormwater Lagoon.
Supply and installation of geonet, geomembrane and geotextile for a landfill application in Dublin, including rigrous QA specifications. Approx. 60,000m2 of materials.
Installation of 1.5mm HDPE geomembrane liner with leak detection systems to five waste water storage lagoons totalling 112,000m2.
Supply and installation of 1.5mm HDPE to a waste water storage lagoon of 25,000m2.
Lining of WWTP lagoons for Ceduna Council using HDPE, including design and construction of an under-liner gas release system.
Supply and installation of a 170,000m2 landfill cap to
the Portsmith landfill requiring 680,000m2 of materials.
The cap comprised a four layer sealing and drainage
design including a thin layer X800 series GCL liner over
the CCL cap. This was covered with 1mm textured LLDPE, a
geocomposite drain layer and a filer geotextile. The
[ + read more ]
Supply and installation of HDPE liner for retention of contaminated waste.
Supply and installation of HDPE liner to effluent sump.
HDPE liner to sewage lagoon.
Supply and installation of 330,000m2 of 1.5mm HDPE for heap leach pads and storage ponds.
Supply and installation of three process water ponds including leak detection systems in HDPE.
Tailings dam liner including double liner leak detection system comprising 240,000m2 of surface.
Design and construction of an LLDPE cover for a 200ML water storage.
Supply and installation of a 1.5mm HDPE and AYY geomembrane liner and stockpile pad totalling 14,500m2 with an additional two Storage Dams, 33,800m2 and 6.500m2 respectively.
Supply and installation of a 1.0mm thick HDPE geomembrane liner for the dam located at Jacinth-Ambrosia Mine totalling 3,000m2.
Supply and installation of a 1.5mm thick HDPE geomembrane liner in the East and West Storm Water Dams at BHP-Billiton Olympic Dam.
Installation of 500,000m2 of 2mm HDPE and geotextile for a cellular evaporation pond system.
Supply and installation of HDPE for wall raise to an operational evaporation pond.
Supply and installation of a HDPE lining system with a geotextile cushion layer to an earthern storage lagoon. Approximately 100,000m2.
Supply and installation of HDPE lining systems with a geotextile cushion layer to a brine storage and a chemical waste water storage facility. Approximately 130,000m2.
Supply and installation of 1.5mm HDPE lining system to three waste water storage lagoons. Approximately 100,000m2.
Supply and installation of HDPE primary and secondary lining systems, including leak detection.
Supply and installation of 1.5mm HDPE liner with a
partial geotextile cushion layer to two ponds totaling
approximately 120,000m2 of surface area in two discrete
mobilisations. The client required a high installation
rate necessitating allocation of a large installation
team accommodated in the clients adjacent camp
[ + read more ]
Supply and installation of 240,000m2 of HDPE membrane to heap leach pads with drains and process and storm water ponds for the White Dam Gold mine in Northeast SA.
Supply and installation of 180,000m2 of 2.0mm HDPE with geotextile underlay for a waste water treatment lagoon system.
Design and construction of five storage lagoons in HDPE with 2.00mm HDPE primary liners and 1.5mm secondary membranes with automatic leak detection systems for Uranium One’s Honeymoon ISL Operations.
Design, supply and installation of double lined process water ponds including leak detection, monitoring and automatic pumping systems; entirely fabricated and installed by Fabtech. 2.00mm HDPE primary liners, M5 flow net, 1.00mm HDPE secondary liners, precast concrete wells and automatic pump systems were also used.
Design, supply and installation of three storage lagoons for Beverley Mines. To assure environmental performance the process lagoons have a double liner with leak detection systems.
Supply and installation of 1.5mm HDPE lining system to a wastewater storage lagoon. Approximately 50,000m2 of material.
Installation of a small leach pad using HDPE geomembrane for this remote site mine.
Supply and installation of Fabtech designed and
certified high volume, low aspect ratio holding tanks
configured both individually and combined in a tank farm
configuration. The selected holding capacities were 2.5
and 3.4ML’s. The contract currently comprises 37
units.
[ + read more ]
Installation of lining systems to 500,000m2 of surface
configured as four discrete ponds with connecting
spillways, HDPE plate sumps, and HDPE plate mounting
systems for inlet and outlet pipework. This required in
excess of 150km of fusion seam welding to strict QC
requirements. The lining system comprised a geotextile
[ + read more ]
Supply and installation of a geotextile cushion layer
and a 2mm HDPE primary liner for the feed water lagoon
system and effluent pond at the clients’ water
treatment plant. The surface area of the system was
approximately 170,000m2. The installation included
spillways, causeways and other structures with the
[ + read more ]
Prior to contract award Fabtech provided specification
and design advice to AGL. Fabtech was contracted by
Ostwald Bros who were the head contractor for this
remote area holding pond. The project criteria was to
supply and install a geotextile cushion layer under
an HDPE liner system. The surface area lined was
[ + read more ]
Three ponds requiring the installation of HDPE liners
with a total area of approximately 150,000m2. Materials
were contracted by Santos and supplied by Fabtech, the
installation was contracted by Bardrill to Fabtech.
The ponds are of composite liner design using 1.5mm
[ + read more ]