BACK TO TOP

MacKay Casings - Anaerobic Reactor Cover Replacement

Projects ~ Covers

Principal: Mackay Casings
Head Contractor:
Location:
Date: 1336358066_Image_1_Mackay_Casings.jpg

Project Scope:

Design and construct project for removal of existing PP cover, design of new HDPE cover, gas collection and rain water disposal system for a HRAL. Installation was performed over the full but decommissioned lagoon.

Gallery:

Share: