Santos - Leewood Waste Water Treatment Ponds
Projects ~ Liners
Principal: Santos
Head Contractor: 1418874687_Optimized-IMG_1039.JPG
Location: 1418874095_216.jpeg
Date: 1418869232_Santos_Leewood_Waste_Water_Treatment_Ponds_NSW.JPG
Project Scope:
Fabtech was engaged by Daracon to undertake the supply and installation of geomembrane lining systems to four of Santos’ waste water treatment ponds.