Santos - GLNG Upstream Fairview HUB 04

Projects ~ Liners

Principal: Santos
Head Contractor: 1375753557_Image_3_Shawn_Brown.jpg
Location: 1375753557_Image_2.jpg
Date: 1375762804_Image_1_Compressed.jpg

Project Scope:

Supply and installation of triple layer lining system, permanent ballasting of the floor, animal egress and water level indicators to the following associate ponds: 
 
• 200ML Associated Water Balance Pond
• 340ML Permeate Pond 
• 4 x 350ML Brine Ponds A, B, C & D
 
 
 

Additional Information:

Clough Downer Joint Venture