Santos - GLNG Upstream Fairview HUB 04
Projects ~ Liners
Principal: Santos
Head Contractor: 1375753557_Image_3_Shawn_Brown.jpg
Location: 1375753557_Image_2.jpg
Date: 1375762804_Image_1_Compressed.jpg
Project Scope:
Supply and installation of triple layer lining system, permanent ballasting of the floor, animal egress and water level indicators to the following associate ponds:
• 200ML Associated Water Balance Pond
• 340ML Permeate Pond
• 4 x 350ML Brine Ponds A, B, C & D