QGC - Orana 2 Cell 5 Storage Dam

Projects ~ Liners

Principal: QGC
Head Contractor: 1336374767_Image_3_Orana_2_Cell_5.jpg
Location: 1336374715_Image_2_Orana_2_Cell_5.jpg
Date: 1336374699_Image_1_Orana_2_Cell_5.jpg

Project Scope:

Supply  and installation of geomembrane liner, cuspated 3m drains, biaxial 1m drains, fabricate and place ballast bags, and drainage sumps.

The Golders design incorporated a drainage system with five cuspated drain arterial channels wrapped in filter fabric with a herringbone system of feed channels of filter fabric wrapped bi-axial drain. The design also incorporated high lineal mass rate encapsulated permanent ballast at the tow and floor crests and a high load capacity anchor trench to avoid wind damage.

Pond commissioning included electronic leak detection surveying.

 

Additional Information:

Ostwald Bros

Gallery:

Share: