Wyndham City Council - Werribee Wests Road Landfill Cell 4B

Projects ~ Landfill

Principal: Wyndham City Council
Head Contractor: 1413175486_1336368674_IMG-20120307-00075.jpg
Location: 1413175406_1336368674_IMG-20120307-00077.jpg
Date:

Project Scope:

Supply and install of 2.0mm single sided textured HDPE geomembrane for the north bund wall and the south side wall.  Supply and install 2.0mm smooth HDPE geomembrane for the basal liner including sumps and under the eastern temporary bund wall. Supply and install cushion geotextile to cover all exposed geomembrane liner on the north wall and southern bund wall (including anchor trenches). Supply and install cushion geotextile to cover all exposed geomembrane liner across the cell base including sumps and under the eastern temporary bund wall; and supply and install separation geotextile to cover all exposed leachate drainage aggregate (floors and sumps).

 

Additional Information: