Grampians Wimmera Mallee Water - Horsham Low Level Water Storage Floating Cover
Projects ~ Covers
Principal: Grampians Wimmera Mallee Water
Head Contractor: 1336028893_Image_3_Horsham_Cover.JPG
Location: 1336026577_Image_2_Horsham_Cover.JPG
Date: 1336028893_Image_1_Horsham_Cover_a.JPG
Project Scope:
Design, supply, and construction of a floating cover on Horsham Low Level Potable Water Storage to eliminate evaporation, air and animal-born contamination of the potable water and accommodate an existing jetty structure in the lagoon.